Philippines NTC 77-81 GHz Movement Detection Rules
- 20 hours ago
- 4 min read
Philippines NTC 77-81 GHz: Movement Detection Equipment Rules Under MC 004-06-2026
The Philippines has moved a long anticipated millimeter wave rule from consultation draft to enacted regulation. The National Telecommunications Commission (NTC) has issued Memorandum Circular No. 004-06-2026, dated 29 June 2026, amending Section 2 of the long standing Memorandum Circular No. 03-05-2007 and formally opening the 77–81 GHz band for Short Range Devices (SRDs) in the Equipment for Detecting Movement and Alert category, at a maximum of 50 mW EIRP.
For manufacturers, importers, and test laboratories handling 77/79 GHz automotive radar and industrial motion sensing hardware, the circular closes a long standing gap in the Philippine market access pathway. Products that previously operated without an explicit band allocation now have a defined frequency envelope and power ceiling to certify against.
The Philippines NTC 77-81 GHz Amendment at a Glance
The amendment revises the full table of permitted frequency bands and maximum power limits for the Detecting Movement and Alert SRD category the class covering motion sensors, radar, and comparable alert systems. The headline change is the inclusion of the 77–81 GHz range, the millimeter wave band already used internationally for short range automotive radar (77/79 GHz distance, blind spot, parking, and lane departure systems) and for industrial level and movement sensing.
Key parameters:
Instrument: Memorandum Circular No. 004-06-2026 (amends Section 2 of MC No. 03-05-2007)
Date of issuance: 29 June 2026
Regulator: National Telecommunications Commission (NTC), Philippines
New band added: 77–81 GHz
Maximum power for the new band: 50 mW EIRP
SRD category: Equipment for Detecting Movement and Alert (low-power radar for radiodetermination)
Legal basis: Act No. 3846, as amended (Radio Control Law); Republic Act No. 7925 (Public Telecommunications Policy Act); Executive Order No. 546, s. 1979
Prior stage: Public consultation, with a public hearing held 2 June 2026
Amended Section 2 Full Band Table
The revised operating parameters for Equipment for Detecting Movement and Alert are as follows:
Frequency Band | Maximum Power (EIRP) |
2400 – 2483.5 MHz | 25 mW |
9200 – 9500 MHz | 25 mW |
9500 – 9975 MHz | 25 mW |
13.4 – 14.0 GHz | 25 mW |
24.05 – 24.25 GHz | 100 mW |
77 – 81 GHz | 50 mW |
The circular specifies that these limits may not be exceeded by any function of the equipment or by any means so the caps apply across every operating mode of a device, not only its primary sensing function. The NTC also states that any prior circular, memorandum, order, or provision inconsistent with the update is deemed amended or superseded.

Legal Basis and Effective Date
The NTC issued the amendment under its authority pursuant to the Radio Control Law (Act No. 3846, as amended), the Public Telecommunications Policy Act (Republic Act No. 7925), and Executive Order No. 546, series of 1979. The Commission frames the update as a measure to keep pace with developments in wireless technology and to ensure wider, more cost effective access to the limited radio spectrum.
The circular takes effect fifteen (15) days following its publication in a newspaper of general circulation and its filing with the Office of the National Administrative Register (ONAR) of the University of the Philippines Law Center. Because the clock starts from publication and ONAR filing rather than the 29 June issuance date, the exact effective date depends on when those steps are completed confirm the published date to fix your compliance deadline.
What This Means for Manufacturers
The practical effect is a clear, defined legal pathway for millimeter wave radar and movement detection products in the Philippines, aligning the country more closely with markets such as the United States and India that already accommodate radar services across the 76–81 GHz range.
A defined type approval route now exists. 77/79 GHz automotive radar, ADAS sensors, and industrial radar that previously sat in a regulatory grey area now have an explicit band allocation and power ceiling to certify against.
50 mW EIRP is a hard ceiling. Devices operating in 77–81 GHz for movement detection and alert must not exceed 50 mW EIRP in any mode. Validate hardware design, RF front end tuning, and test protocols against this limit before submission.
Product scoping matters. The allocation applies specifically to the Detecting Movement and Alert SRD category. Confirm that your device's function and radiated parameters fall within that category and within the 77–81 GHz / 50 mW EIRP envelope.
Documentation alignment is the differentiator. Manufacturers who prepare test reports and compliance documentation against the updated Section 2 parameters ahead of the effectivity date will be best placed to launch without market access delays.
Reconcile consultation era records. If your team engaged during the consultation phase, note that this circular is the enacted successor to that draft. Align internal records to the final MC No. 004-06-2026 parameters rather than the consultation text.
Certification Impact Summary
Area | Impact | Manufacturer Consideration |
Band access | 77–81 GHz formally allocated for Detecting Movement and Alert SRDs | Confirm your device operates within this band and category |
Power limit | Maximum 50 mW EIRP, applicable across all operating modes | Validate radiated power in test reports; retune if margins are tight |
Instrument type | Type-approval / equipment-authorization technical parameter (not a spectrum-licensing instrument) | SRD approval obligations attach to the device, not to operator licensing |
Applicable devices | 77/79 GHz automotive radar, ADAS, industrial level/movement sensors | Scope your product portfolio against the updated Section 2 table |
Legacy status | MC No. 03-05-2007 amended; inconsistent prior provisions superseded | Refresh compliance references to MC No. 004-06-2026 |
Standards basis | Devices must meet the applicable radio standards for the band | Coordinate testing against the relevant mmWave radar standard |
Timeline and Required Actions
Date / Trigger | Event | Required Action |
2 June 2026 | Public hearing on the proposed amendment (consultation stage) | Completed no action now |
29 June 2026 | NTC issues Memorandum Circular No. 004-06-2026 | Review the final parameters against your product |
Publication + ONAR filing | Circular published in a newspaper of general circulation and filed with the ONAR | Confirm the published date to fix the effectivity clock |
15 days after publication/filing | Circular takes legal effect | Ensure devices meet the 77–81 GHz / 50 mW EIRP limits before this date |
Ongoing | Type-approval submissions to NTC | Align test reports and documentation to MC No. 004-06-2026; engage your partner early |
