top of page
No regulatory updates found matching your search.
Global Regulatory Intelligence
Stay ahead of evolving market access requirements, compliance frameworks, and certification updates worldwide.
Filter items with Label


Argentina INTI RF Testing Resumes for ENACOM Approval
Argentina's Instituto Nacional de Tecnología Industrial (INTI) has resumed local RF testing with limited staff under a court-ordered injunction, after earlier discontinuing the service amid the dispute over INTI Resolution 42/2026. RF testing remains mandatory for ENACOM homologation, and the injunction is temporary. Manufacturers should confirm laboratory capacity, keep alternative accredited labs in view, and plan filings around the 1 December 2026 RAMATEL transition.
Oct 55 min read


Malaysia 5G Technical Codes: MTSFB Consultation 2026
Malaysia's MTSFB has opened public consultations on four draft Technical Codes: first revisions of the IMT-2020 (5G) Base Station, Cellular Booster Equipment and User Equipment codes, plus a new IoT Syntactic Data Interoperability code. The 5G drafts add the 3300, 3600 and 4700 MHz bands and move marking, EMC and safety rules to MCMC MTSFB TC T022. Comments close on 14 October 2026 for the 5G codes and 30 October 2026 for the IoT code.
Oct 58 min read


Mexico: CRT Procedure Simplification Opens Homologation Consultation
Mexico's CRT has opened a public consultation on a draft agreement to simplify 39 regulatory procedures, including nine tied to homologation and conformity assessment. Published September 10, 2026 by the Dirección General de Concesiones, Autorizaciones y Registros (DGCAR), the proposal covers electronic filing, merged procedures, and updated response times. The non-binding consultation runs through October 9, 2026. Here's what manufacturers preparing type approval filings in
Sep 173 min read


Honduras WAS/RLAN Spectrum Expansion: CONATEL Opens Full 6 GHz Band
Honduras has expanded its WAS/RLAN general-license spectrum from 5925–6425 MHz to the full 5925–7125 MHz 6 GHz band. Effective September 2, 2026, CONATEL Resolution NR003/26 amends National Note HND40A of the Frequency Allocation Plan, paving the way for Wi-Fi 6E and future Wi-Fi 7 deployments. This article breaks down the Honduras WAS/RLAN spectrum expansion, its certification impact for equipment manufacturers, and the compliance actions needed to bring devices to market un
Sep 163 min read


Madagascar: ARTEC Tightens Type Approval, Product Samples Now Mandatory
Madagascar's telecom regulator ARTEC is now strictly enforcing mandatory sample submission for type approval, under the long-standing Decree No. 2014-1650. This ARTEC Madagascar type approval update means manufacturers can no longer rely on technical compliance files alone — a physical product sample is required for testing. Here's what changed, what it means for manufacturers, and the timeline and steps to stay compliant.
Sep 33 min read


Ivory Coast: ARTCI Opens Public Consultation on VoLTE and VoWi-Fi Regulatory Framework
Côte d'Ivoire's telecom regulator ARTCI has opened a public consultation on establishing a regulatory framework for VoLTE and VoWi-Fi services. Running from August 10 to September 11, 2026, the consultation invites operators, equipment vendors, and stakeholders to submit feedback that will shape the country's rules for these next-generation voice technologies, with direct implications for device certification, network compliance, and market entry timelines.
Sep 23 min read


Dominican Republic Telecommunications Law: INDOTEL Reform
On 14 August 2026, the regulator INDOTEL presented a proposed Dominican Republic telecommunications law — the General Law on Telecommunications, Digital Infrastructure and Connectivity — to modernise the 27-year-old Law 153-98. The draft introduces a single concession, an electronic one-stop window, network sharing, efficient spectrum management, a cybersecurity regime and stronger user protections. It remains a proposal under executive legal review, not an enacted rule, not
Aug 314 min read


Pakistan Telecom Equipment Certification: PTA 2024 Rules
Pakistan telecom equipment certification is now mandatory. The Pakistan Telecommunication Authority (PTA) has notified the Telecommunication Equipment Standards Regulations, 2024 through SRO 1110(I)/2026, requiring all telecom equipment manufactured, imported, sold or used in Pakistan to meet international technical, safety and electromagnetic standards. Manufacturers and importers must now obtain a Certificate of Compliance backed by accredited-lab test reports before market
Aug 265 min read


Philippines NTC 77-81 GHz Movement Detection Rules
The National Telecommunications Commission has finalized the Philippines NTC 77-81 GHz allocation through Memorandum Circular No. 004-06-2026, amending Section 2 of MC No. 03-05-2007. The 77-81 GHz band is now formally opened for Equipment for Detecting Movement and Alert at a maximum of 50 mW EIRP, giving automotive and industrial radar manufacturers a defined market-access pathway. This GMA Labs briefing sets out the certification impact, timeline, and required actions.
Aug 264 min read


Bahrain TRA Type Approval: Specs Updated to Version 1.1
The Telecommunications Regulatory Authority (TRA) has published Version 1.1 of its Technical Specifications - Requirements for Type Approval, dated 30 July 2026. The updated document supersedes the first edition issued in February 2024 and reflects amendments to the technical requirements for equipment certification in Bahrain. Manufacturers and importers should review the revised Bahrain TRA Type Approval specifications and confirm their certification pathways remain complia
Aug 253 min read


South Korea Reallocates LTE Spectrum for 5G: RRA Revises Wireless Equipment Standards
South Korea 5G spectrum reallocation lets carriers run 5G on frequencies previously reserved for LTE. On 24 July 2026, the National Radio Research Agency (RRA) revised the Technical Standards for Wireless Equipment for Telecommunications Business, adjusting LTE band conditions to accommodate 5G transmission methods and aligning supply-power limits with international standards. Manufacturers using the reallocated bands should confirm whether existing KC certifications need re-
Aug 254 min read


Mexico IFT-011-2022 Amendment: Emergency Alert Rules
Mexico's telecom regulator, the CRT, has run a public consultation on a proposed amendment to IFT-011-2022, Part 3 - the mandatory Cell Broadcast Service rules for risk and emergency alerts on mobile terminal equipment. The Mexico IFT-011-2022 amendment would add alert-message categories, audible and vibration cues, a bar on users disabling alerts, and new test methods for certification bodies and labs. The comment window (10-21 August 2026) has closed; attention now shifts t
Aug 254 min read


Vietnam Circular 36/2026: Risk Based Device Rules
Vietnam Circular 36/2026 (36/2026/TT-BKHCN) took effect on 1 July 2026, replacing Circular 29/2025 and the legacy MIC type-approval regime with a two-tier, risk-based system for IT, telecom and RF hardware. High-risk products need certification and pre-import State quality inspection; medium-risk goods clear the border on self-declaration; low-power modules under 60 mW EIRP are exempt. Existing certificates stay valid until they expire. Here is what it means for manufacturers
Aug 255 min read


India C-V2X 5.9 GHz De-Licensing: DoT Exempts OBUs
India's Department of Telecommunications has confirmed the India C-V2X 5.9 GHz de-licensing, exempting Cellular Vehicle-to-Everything On Board Units in the 5875–5905 MHz band from spectrum licensing under G.S.R. 466(E), effective 10 June 2026. Auto manufacturers, Tier 1 suppliers, and V2X module vendors can deploy V2V and V2I safety systems without individual spectrum licences — but equipment type approval and BIS or international standards conformity still apply before marke
Aug 254 min read


Philippines NTC 77-81 GHz SRD Rules for Radar
The Government of Rwanda has approved a phased roadmap to retire its legacy mobile networks. The Rwanda 3G network shutdown is scheduled nationwide for 30 June 2027, while 2G retirement is currently targeted for December 2028, subject to a readiness assessment led by MINICT and RURA. This GMA Labs briefing explains what the transition means for device manufacturers, importers and labs, and sets out the certification impact, timeline and required actions to keep products marke
Aug 203 min read


Paraguay CONATEL Homologation Rules Under Review
Paraguay CONATEL homologation rules are under review: the regulator opened, then closed, a public consultation diagnosing the weaknesses of its 2009 framework (Resolution 588/2009). Run as an ITU-supported Regulatory Impact Analysis pilot, the review flags a fragmented rulebook with no categories for IoT, wearables or 5G NR devices, no cybersecurity requirements, per-model fees and weak customs coordination. No draft rule exists yet, but manufacturers should prepare for a mod
Aug 186 min read


RRA KS X 3270 5G NR Test Scope Expands to Six Bands
South Korea's RRA has expanded the RRA KS X 3270 5G NR conducted test methods, widening coverage from two bands to six by adding n1, n3, n5 and n7, and introducing FDD alongside the existing TDD mode. Issued as a priority pre-implementation notice, the revised requirements take effect July 24, 2026 for new KC conformity assessments. Manufacturers with 5G devices in the KC pipeline should confirm test plans and lab scope reflect the broader band set and dual-duplex support bef
Aug 183 min read


Indonesia KBLI 2025 Live in OSS & AHU: Certification Impact
Indonesia KBLI 2025 became operative in the OSS and AHU Online systems on 15 June 2026, replacing KBLI 2020 across risk-based business licensing. For importers and local representatives handling equipment type approval, it is a prerequisite step: OSS accounts must carry valid KBLI 2025 codes before certification applications can proceed. Existing licences stay valid and most code conversions run automatically, but activity mismatches or deed amendments can stall submissions.
Aug 175 min read


Iraq CMC Type Approval: New QR Code Certificate Format
Iraq's Communications and Media Commission (CMC) has adopted a new type approval certificate format. The updated Iraq CMC type approval certificate now carries a QR code that lets customs officials, importers, and buyers verify authenticity, and it displays the product's key technical specifications directly on the certificate. The change is administrative: it improves verification but does not change testing scope or the obligation to obtain type approval before import or sa
Aug 143 min read


Egypt NTRA Mobile Phone Activation Compliance Rules
The Egypt NTRA mobile phone activation measure blocks new handsets that fail approved international standards—notably GSMA IMEI rules—from being switched on across Egyptian networks. Effective 1 February 2025 under Telecom Law No. 10 of 2003, it enforces existing type-approval duties at the network layer. For manufacturers and importers, valid IMEI/TAC allocation, NTRA type approval, and Digital Service Platform registration now decide whether a device activates, not just cle
Aug 145 min read
bottom of page














