top of page

Indonesia 5G BWA 3.3 GHz Standards: Komdigi Draft

  • 2 days ago
  • 4 min read

Indonesia Opens Consultation on 5G BWA Technical Standards for the 3.3 GHz Band


Indonesia's Ministry of Communication and Digital Affairs (Komdigi) has published a draft Ministerial Decree setting technical standards for 5G Broadband Wireless Access (BWA) equipment operating in the 3.3 GHz band, and opened it for public consultation. The draft a Rancangan Keputusan Menteri (RKM) issued through the Directorate General of Digital Infrastructure (DJID) on 31 July 2026 establishes conformity requirements for both Subscriber Stations and Base Stations before the standard is finalised and enforced.


For manufacturers, importers, and certification bodies preparing IMT-2020 equipment for the Indonesian market, this is a prospective instrument that has not yet taken effect. The comment window is short: written submissions are due to Komdigi by 14 August 2026.


What the draft covers


The instrument is formally titled the Draft Ministerial Decree on Technical Standards for Telecommunications Equipment and/or Broadband Wireless Access Telecommunications Devices Based on the International Mobile Telecommunications-2020 (IMT-2020) Technology Standard in the 3.3 GHz Radio Frequency Band. It is issued to execute Articles 34(1) and 37(1) of Government Regulation (PP) No. 46 of 2021 on Post, Telecommunications, and Broadcasting, which require any telecommunications equipment made, assembled, imported for trade, or used in Indonesia to meet technical standards set by the Minister.

Komdigi states the draft fills a regulatory gap: earlier rules did not yet accommodate technical standards for 5G (IMT-2020) BWA devices operating specifically in the 3.3 GHz range. The draft carries two annexes detailing the equipment specifications and operational limits.


Scope of the Indonesia 5G BWA 3.3 GHz standard


The draft addresses a narrow, clearly defined slice of spectrum and two device classes. Both Subscriber Stations and Base Stations are specified to operate within 3300–3312.5 MHz using Time Division Duplex (TDD), with a maximum channel bandwidth of 10 MHz.


Subscriber Station (SS) requirements


The draft sets the following requirements for Subscriber Station BWA 5G equipment:


  • Operation in 3300–3312.5 MHz (TDD), maximum 10 MHz channel bandwidth.

  • Maximum transmitter output power of 23 dBm, with a tolerance of +3/−4 dB.

  • Power supply via a wired connection to mains electricity or Power over Ethernet (PoE); battery power is expressly prohibited.


Base Station (BS) requirements


For Base Station BWA 5G equipment, the draft specifies Type 1-C devices intended for Micro Cell deployment scenarios:


  • Operation in 3300–3312.5 MHz, maximum 10 MHz channel bandwidth.

  • 4T4R transmitter configuration.

  • Maximum output power of 5 watts per port.

  • Certification applicants must submit a test report in which testing was performed with an integrated or external filter. Unwanted emission and spurious emission test methods are specified in detail to prevent signal leakage into adjacent services.


Antenna, safety, and EMC provisions


  • Antenna: Antennas working with BS BWA 5G equipment are limited to a maximum gain of 18 dBi and must meet the technical standard for IMT base station antennas.

  • Electrical safety: All equipment (SS and BS) must meet the risk-based electrical safety standards SNI IEC 62368-1 and/or SNI IEC 60950-1.

  • EMC emissions: All equipment must comply with SNI CISPR 32 and/or the ETSI EN 301 489 series for electromagnetic compatibility emissions.

  • Deferred provisions: EMC immunity requirements and non ionizing radiation limits are not set here Komdigi indicates these will be governed by a separate Ministerial Decree.


Modern workspace desk with a monitor displaying headline text "Indonesia Opens Public Consultation: 5G BWA Technical Standards (3.3 GHz)" alongside a 5G map, regulatory papers, testing gear, and an August 14, 2026 deadline display.

What this means for manufacturers


This is a draft under consultation, not an enforceable standard. No new type approval obligation exists today. However, once the RKM is finalised as a Keputusan Menteri, it will become the technical standard against which 3.3 GHz IMT-2020 BWA equipment is certified for the Indonesian market so it is directly relevant to certification planning, not merely a spectrum allocation notice.

Several points deserve attention now:


  • The band is very narrow. Although the instrument is described as covering "the 3.3 GHz band," the regulated sub range is only 3300–3312.5 MHz a 12.5 MHz slice at the lower edge of the band. Product roadmaps should be scoped accordingly and not assume the full 3.3–3.4 GHz range is addressed.

  • This is a distinct instrument. It should not be confused with Ministerial Decree No. 204 of 2025, which set IMT-2020 BWA technical standards for the n50 band (1432–1517 MHz) and has been in force since 23 May 2025. The 3.3 GHz draft is a separate standard for a different band.

  • The filter and emission requirements are the sharp edge for BS certification. Base Station test reports must reflect testing with an integrated or external filter, and the emission methodology is prescriptive. Labs and applicants should confirm test setup compatibility early.

  • The consultation window is the opportunity to influence the text. Stakeholders operators, manufacturers, test labs, and certification bodies can submit written comments before the parameters are locked in.


Certification impact summary


Area

Draft position

Impact on certification

Instrument status

Draft Ministerial Decree (RKM) under public consultation

No obligation yet; prepare for a future mandatory standard

Frequency / duplex

3300–3312.5 MHz, TDD

Narrow 12.5 MHz sub band; confirm product tuning range

Channel bandwidth

10 MHz maximum

Test plans must reflect the bandwidth ceiling

SS output power

23 dBm max (+3/−4 dB)

RF conformance testing to declared limit

SS power source

Wired mains or PoE; no batteries

Battery powered SS designs are out of scope

BS type / scenario

Type 1-C, Micro Cell

Confirm equipment class matches the specified type

BS output power

5 W per port

Per port power verification required

BS TX configuration

4T4R

Test configuration must match

BS filter

Integrated or external filter in test report

Mandatory for BS certification submission

Antenna gain

18 dBi maximum

Declare and verify against the cap

Safety

SNI IEC 62368-1 and/or 60950-1

Standard electrical safety evidence

EMC emissions

SNI CISPR 32 and/or ETSI EN 301 489 series

Emissions testing to referenced standards

EMC immunity / NIR

Deferred to a separate decree

Monitor for the follow on instrument


Timeline and required actions


Date

Event

Recommended action

31 July 2026

Komdigi publishes draft RKM and two annexes for public consultation

Download and review the draft and annexes

Now – 14 August 2026

Public consultation open

Prepare and submit written comments to Komdigi

14 August 2026

Deadline for written submissions

Ensure comments are lodged before close

After 14 August 2026

Komdigi reviews input; RKM finalisation expected (date not announced)

Track for the final Keputusan Menteri and effective date

Post-finalisation

Standard becomes mandatory for 3.3 GHz IMT-2020 BWA certification

Align test plans and certification submissions


bottom of page