Canada SRSP-310.7 11 GHz Requirements: ISED Issue 5 Adds Upper Sub-Band Channels for Fixed Links
The Canada SRSP-310.7 11 GHz requirements have moved from consultation to final. Innovation, Science and Economic Development Canada (ISED) released Standard Radio System Plan SRSP-310.7, Issue 5, under notice SMSE-012-26, signed on 30 October 2026 and published in the Canada Gazette, Part I, on 7 November 2026. Issue 5 replaces Issue 4 and is now official. It sets the minimum technical requirements for point-to-point radio systems in the fixed service operating in 10.7–11.7 GHz, a band widely used for microwave backhaul.
Background: the 11 GHz band and the Anik G1 decision
ISED consulted on the draft Issue 5 in mid-2026. The main driver is Decision SMSE-004-26, which dealt with Telesat's request for continued operation of the Anik G1 satellite at 107.3°W in the extended Ku-band frequencies 11.075–11.2 GHz and 11.575–11.7 GHz. Issue 5 brings the terrestrial channel plan in line with that decision, so fixed links can use those sub-bands under defined conditions. At the same time, ISED is moving general requirements into SRSP-300-Gen, its common document for fixed systems above 960 MHz.
Key Changes in the Canada SRSP-310.7 11 GHz Requirements
According to the Issue 5 preface, the main changes are:
The RF channel arrangement now includes channels covering 11.075–11.2 GHz and 11.575–11.7 GHz.
Requirements already covered by SRSP-300-Gen have been removed.
Some outdated provisions that added restrictions in congested areas have been removed.
Editorial changes and clarifications have been made throughout.

How the new sub-bands can be used
ISED expects every effort to be made to assign new links in 10.7–11.075 GHz and 11.2–11.575 GHz before using the upper sub-bands. Applicants asking for 11.075–11.2 GHz or 11.575–11.7 GHz must provide technical justification for not using the lower sub-bands. New systems should normally use the lowest frequency pair that can be coordinated.
Technical requirements in Issue 5
The plan supports 10, 20, 30, 40, 60 and 80 MHz channel spacings with a common 490 MHz transmit/receive separation. Transmitter power at the antenna input is limited to 10 W (+10 dBW) per channel for bandwidths above 20 MHz up to 80 MHz, and 7.5 W (+8.7 dBW) for 20 MHz or less. Maximum e.i.r.p. is +55 dBW per channel, and frequency stability must be within ±0.003%.
Minimum spectral efficiency is 4.4 bit/s/Hz in moderately and highly congested areas and 3.0 bit/s/Hz elsewhere. Antennas must meet Envelope A in congested areas and Envelope B elsewhere. Co-channel dual polarisation (CCDP) is encouraged, and applicants using 60 or 80 MHz spacing without CCDP may have to justify that choice.
Working with SRSP-300-Gen
Issue 5 must be used together with SRSP-300-Gen. Where the two documents differ, SRSP-310.7 takes precedence. Applications follow RSP-113. Systems licensed as standard before Issue 5 can continue as standard, with extensions or changes considered case by case.
What This Means for Manufacturers
Radio and antenna suppliers can now offer channel tables that include the upper sub-bands for Canadian customers.
Product documentation for Canada should reflect the Issue 5 channel plan, power limits and spectral efficiency thresholds.
Because some requirements now sit only in SRSP-300-Gen, compliance reviews need both documents.
Operators will need technical justification to use the new channels, so suppliers may be asked for supporting data.
Equipment for Canada and the US is often shared, so it's worth checking that the Canadian channel set is enabled correctly in firmware.
Certification Impact Summary
Area | Before | After | Impact level |
Channel plan | Issue 4 arrangement | Channels added for 11.075–11.2 GHz and 11.575–11.7 GHz | High |
Use of upper sub-bands | Not part of the plan | Allowed with technical justification; lower sub-bands first | Medium |
Duplicated general rules | Repeated in SRSP-310.7 | Removed; covered by SRSP-300-Gen | Medium |
Congested-area restrictions | Some additional provisions | Outdated provisions removed | Low |
Existing standard systems | Licensed under Issue 4 | May continue as standard | Low |
Application process | RSP-113 | RSP-113, assessed with SRSP-300-Gen | Low |
Timeline and Required Actions
Key Dates
Date | Milestone |
Mid-2026 | ISED consults on draft SRSP-310.7 Issue 5 |
30 October 2026 | Issue 5 released; notice SMSE-012-26 signed |
7 November 2026 | Notice published in the Canada Gazette, Part I |
Ongoing | New 11 GHz systems must conform to Issue 5 |
Required Actions for Manufacturers
Update Canadian channel tables to include the Issue 5 upper sub-band channels where your radios support them.
Check transmitter power, e.i.r.p. and frequency stability against the Issue 5 limits.
Confirm your modulation options meet the 4.4 and 3.0 bit/s/Hz spectral efficiency thresholds.
Review antenna patterns against Envelopes A and B.
Read SRSP-300-Gen alongside Issue 5, since some requirements moved there.
Prepare technical notes customers can use when justifying upper sub-band assignments.
Conclusion
SRSP-310.7 Issue 5 opens more 11 GHz spectrum for fixed links in Canada while asking operators to use it carefully. For suppliers, the work is mostly in channel tables, documentation and a closer read of SRSP-300-Gen. Contact our team for help checking your fixed radio equipment against the Canada SRSP-310.7 11 GHz requirements and ISED certification rules.