top of page

Canada RSS-193 Issue 2 Certification: 24-40 GHz Rules

13 hours ago
4 min read

Canada RSS-193 Issue 2 Certification: ISED Extends mmWave Rules to 24, 26 and 39 GHz Equipment


Canada RSS-193 Issue 2 certification requirements took effect on 29 October 2026. Innovation, Science and Economic Development Canada (ISED) published Issue 2 of Radio Standards Specification RSS-193 on its website that day and confirmed it in Canada Gazette Notice No. SMSE-013-26 on 14 November 2026. The standard now sets the certification rules for flexible use broadband equipment in 24.25-28.35 GHz and 37.6-40.0 GHz, which takes in the 26 GHz and 39 GHz millimetre-wave bands Canada is opening for 5G.


Background: why ISED widened RSS-193


Issue 1 of RSS-193, published on 11 July 2025, only covered equipment in 27.5-28.35 GHz. Since then ISED has been preparing licensing frameworks for neighbouring spectrum. Its draft SRSP-522 Issue 2, which GMA Labs covered on 6 November, adds 24.25-25.1 GHz to non-competitive local licensing, and a new SRSP-523 is planned for 25.1-27.5 GHz and 37.6-40.0 GHz. Both are still listed as "pending publication". RSS-193 Issue 2 puts the equipment side in place first, so manufacturers can certify products for those bands now.


Key Changes in the Canada RSS-193 Issue 2 Certification Rules


ISED's preface lists two main changes: technical requirements for 24.25-27.5 GHz and 37.6-40.0 GHz, plus editorial changes and clarifications. In practice, that means the following.


Scope and equipment types

The standard applies to base station, fixed service and subscriber equipment, used in fixed or mobile services. Equipment remains Category I. It needs either a Technical Acceptance Certificate (TAC) from ISED's Certification and Engineering Bureau or a certificate from a recognised certification body, and it must be licensed under the Radiocommunication Act. Equipment must also meet RSS-Gen.


Band plans

  • 24.25-25.1 GHz: 17 unpaired 50 MHz blocks (BB1 to BB17)

  • 25.1-27.5 GHz: 24 unpaired 100 MHz blocks (A to Z, without I and O)

  • 27.5-28.35 GHz: 17 unpaired 50 MHz blocks (AA1 to AA17)

  • 37.6-40.0 GHz: 24 unpaired 100 MHz blocks (A to Z, without I and O)

Blocks can be aggregated into a block group. Equipment working in both ranges has to show compliance in each band.


Infographic titled "Canada RSS-193 Issue 2 Certification: ISED Extends mmWave Rules to 24, 26 & 39 GHz Equipment," featuring a circuit-board map of Canada with frequency spectrum graphs (24.25–28.35 GHz and 37.6–40.0 GHz), icons for base stations, fixed service, and subscriber equipment, and a regulatory timeline from July 2025 to April 2027.

Power and emission limits

Average e.i.r.p. is capped at 75 dBm per 100 MHz for base station and fixed service equipment (AAS or non-AAS), scaled down for channels narrower than 100 MHz. Fixed subscriber equipment is limited to 55 dBm and mobile subscriber equipment to 43 dBm per channel bandwidth. Unwanted emissions outside the block or block group, measured as TRP or summed conducted power, must stay below -5 dBm/MHz within 10% of the occupied bandwidth and -13 dBm/MHz beyond. Equipment working in 24.25-27.5 GHz has an extra limit to protect 23.6-24.0 GHz: -39 dBW per 200 MHz for base stations and -35 dBW per 200 MHz for mobile subscriber equipment.


Labelling

Base stations operating in 24.45-24.65 GHz must carry, on the equipment or in the user manual, the statement "Operation within 24.45-24.65 GHz is intended for indoor use only".


What This Means for Manufacturers


  • Equipment for 24, 26 or 39 GHz can now be certified in Canada under a published RSS.

  • Products already certified for 28 GHz under Issue 1 should be checked against Issue 2 before the transition ends, especially the emission limits and any new labelling.

  • Test plans need both channel-edge measurements for each supported bandwidth, and separate results per band for dual-band products.

  • 26 GHz radios need the 23.6-24.0 GHz emission test, which protects passive services below the band.

  • Base stations that can operate in 24.45-24.65 GHz need the indoor-only statement in their labelling or manual.


Certification Impact Summary


Area

Before

After

Impact level

Frequency range

27.5-28.35 GHz only (Issue 1)

24.25-28.35 GHz and 37.6-40.0 GHz

High

Equipment types

Flexible use broadband equipment at 28 GHz

Base station, fixed service and fixed or mobile subscriber equipment across all four ranges

Medium

Power limits

Issue 1 values (to be confirmed)

75 dBm/100 MHz, 55 dBm and 43 dBm e.i.r.p. by equipment type

Medium

Protection of 23.6-24.0 GHz

Not applicable at 28 GHz

-39 dBW (base station) and -35 dBW (mobile) per 200 MHz for 24.25-27.5 GHz equipment

High

Labelling

To be confirmed

Indoor-only statement for base stations in 24.45-24.65 GHz

Medium

Applications

Issue 1

Issue 1 or 2 until about 29 April 2027, then Issue 2 only

High


Timeline and Required Actions


Key Dates


Date

Milestone

11 July 2025

RSS-193 Issue 1 published (27.5-28.35 GHz)

29 October 2026

RSS-193 Issue 2 published and in force

14 November 2026

Notice No. SMSE-013-26 in the Canada Gazette, Part I

About 29 April 2027

Six-month transition ends; Issue 2 only

To be confirmed

SRSP-522 Issue 2 and SRSP-523 Issue 1 publication


Required Actions for Manufacturers


  1. List every Canadian product that operates anywhere in 24.25-28.35 GHz or 37.6-40.0 GHz.

  2. Compare Issue 1 test reports for 28 GHz products with the Issue 2 limits and decide whether retesting is needed.

  3. Add the 23.6-24.0 GHz emission measurement to test plans for 24.25-27.5 GHz equipment.

  4. Update labels or manuals for base stations that operate in 24.45-24.65 GHz.

  5. File new applications under Issue 2 so they aren't caught by the end of the transition.

  6. Watch for SRSP-522 Issue 2 and SRSP-523, which will set the deployment conditions for these bands.


Conclusion


RSS-193 Issue 2 opens Canadian certification to 24, 26 and 39 GHz millimetre-wave equipment ahead of the licensing frameworks for those bands. The six-month transition is the main date to plan around. After it, every new application and every unit placed on the market must meet Issue 2. Contact our team for support with ISED certification and Canadian market access.


bottom of page