Trinidad and Tobago: TATT Satellite Services Authorisation Framework Opens for Consultation
Trinidad & Tobago (TATT) Opens Public Consultation on New Satellite Services Authorisation Framework
The Telecommunications Authority of Trinidad and Tobago (TATT) has published a draft Framework for the Authorisation of Satellite Services in Trinidad and Tobago (Version 0.1) for public consultation. Released on September 7, 2026 under TATT reference 2/3/76, the draft framework represents the most comprehensive overhaul to date of how satellite operators, service providers, and equipment users are authorised to operate in the country. Comments on this first of two planned consultation rounds are due by October 19, 2026, and the full document is available on TATT's official website.
Regulatory Background
TATT's authority to manage satellite authorisation stems from Section 18(1)(i) of the Telecommunications Act, Chap. 47:31, which mandates the Authority to plan, supervise, and manage radio frequency spectrum use, including licensing of stations operating in Trinidad and Tobago or aboard registered ships, aircraft, or satellites. Historically, TATT has authorised satellite earth stations VSATs, portable systems, and commercial TV receive-only (TVRO) stations under individual station licences, with public satellite broadband services authorised through a single point to multipoint licence covering both space and earth segments.
The new framework responds to rapid growth in the global satellite sector, particularly the emergence of new geostationary (GSO) and non-geostationary (NGSO) constellations and applications such as satellite IoT and direct-to-device (D2D) connectivity. As a Small Island Developing State (SIDS) vulnerable to climate-related disasters, Trinidad and Tobago has also identified satellite communications as a strategic tool for universal service and emergency resilience, reinforcing the urgency of a structured, modernized authorisation regime.
Focus Keyword in Practice: What the TATT Satellite Services Authorisation Framework Covers
The draft Framework applies to satellite systems operating in the broadcasting-satellite service (BSS), fixed-satellite service (FSS), and mobile-satellite service (MSS) bands. It does not cover public mobile telecommunications services, terrestrial fixed services, or specific service fees, which remain governed by separate instruments, including the Telecommunications (Fees) Regulations, 2006.

Summary of Key Changes
The draft framework introduces several new or clarified authorisation mechanisms:
Registry of Authorised Space Stations with Landing Rights. Satellite operators will be required to register their space stations in a new official registry to provide capacity to earth stations in Trinidad and Tobago. Registration in ITU's Master International Frequency Register (MIFR), or filings in progress, will qualify operators for inclusion, alongside a new administrative registration fee.
Concession requirements tied to gateway location. Whether a satellite operator needs a Type 1 (network-only) or Type 2 (network-service) concession or both now depends on whether the operator's gateway sits inside or outside Trinidad and Tobago, and whether the operator serves an authorised concessionaire or the public directly.
New station-licensing categories. The framework formally accommodates gateways (standalone and network-integrated), telemetry-tracking-and-command (TT&C) stations, portable earth stations, ESIMs (aeronautical, maritime, land), satellite end-user terminals, satellite IoT devices, and D2D networks — several of which previously lacked a dedicated licensing pathway.
Class licensing for mass-market and low-power devices. Locally provisioned ESIMs, consumer-grade satellite IoT devices, and personal locator beacons (PLBs) move to a class-licensing (blanket authorisation) model when supplied by an authorised concessionaire, reducing individual licensing burden.
D2D authorisation pathway. Direct-to-device services are authorised under a point-to-multipoint spectrum licence and Type 1 concession, contingent on an established agreement between the satellite operator and a local terrestrial network operator, aligned with TATT's existing Spectrum Plan for the Accommodation of NTNs in MSS Bands (2 GHz band, 3GPP bands n252/n256).
Space sustainability requirements. Debris mitigation plans will be considered during the Registry application and satellite coordination process, echoing requirements already in force in jurisdictions such as Brazil, the US, Canada, and the Cayman Islands.
Emergency communications alignment. The framework reinforces satellite safety locator device licensing (EPIRBs, ELTs, PLBs) and supports TATT's recommendation that Trinidad and Tobago ratify the Tampere Convention to ease emergency deployment of satellite equipment.
What This Means for Manufacturers
Manufacturers and suppliers of satellite communications equipment including VSAT terminals, ESIM hardware, satellite IoT sensors, D2D-enabled handsets, and portable/flyaway systems should treat this consultation as an early opportunity to shape rules that will directly affect market entry in Trinidad and Tobago.
Equipment certification still applies. The framework confirms that satellite equipment remains subject to TATT's Equipment Standardisation and Certification Framework, and that the Technical Specifications Satellite Station Radiocommunications Systems form (Form TS-SS) will be amended to cover the new station categories.
Class-licensed categories simplify approval for identical-specification units. Manufacturers supplying ESIMs, consumer IoT devices, or PLBs benefit from blanket/class licensing only where units share identical technical parameters and are distributed through an authorised concessionaire; custom or variable-spec units may still require individual or point-to-multipoint authorisation.
D2D and satellite IoT products face band-specific constraints. Devices intended for D2D or narrow-band IoT use must align with the 2 GHz MSS band and 3GPP bands n252/n256 under TATT's existing Spectrum Plan for NTNs — manufacturers targeting this market should confirm RF design compatibility now.
Foreign-registered platform equipment (ESIMs) needs home-country authorisation first. TATT will continue to require that ESIMs on foreign-registered aircraft, vessels, or vehicles hold authorisation in their country of registration before a non-objection certificate is issued locally.
This is the moment to comment. Because this is the first of two consultation rounds, manufacturer and industry feedback submitted now has the greatest chance of shaping final technical and licensing parameters before Version 1.0 is finalized.
Certification Impact Summary
Equipment / Service Type | Current Regime | Proposed Treatment Under New Framework |
VSATs (enterprise/private) | Individual VSAT station licence | Unchanged VSAT telecommunications station licence; point-to-multipoint licence for shared-frequency enterprise networks |
Gateways | Earth station licence (general) | Split into standalone gateways (earth station licence) vs. network-integrated gateways (point-to-multipoint licence), both site-specific |
ESIMs (locally registered platforms) | Limited/ad hoc provisions | Class licensing when supplied by an authorised concessionaire and technically identical per ITU parameters |
ESIMs (foreign-registered platforms) | Non-objection | Unchanged non-objection required, home-country authorisation prerequisite |
Satellite IoT (consumer-grade) | Not formally addressed | Class licensing regime introduced |
Satellite IoT (large enterprise) | Not formally addressed | Point-to-multipoint station/spectrum licence introduced |
Direct-to-Device (D2D) | Not formally addressed | Point-to-multipoint spectrum licence + Type 1 concession, MNO agreement required |
Satellite safety locator devices (PLBs) | Class licence | Unchanged class licence with equipment registration |
TVROs (commercial) | Commercial TVRO station licence | Unchanged |
Space stations providing capacity locally | No formal landing-rights mechanism | New Registry of Authorised Space Stations with Landing Rights, with registration fee |
Timeline & Required Actions
Date | Milestone | Recommended Action |
September 7, 2026 | First round of public consultation opens | Review the draft framework in full against your product/service portfolio |
Now – October 19, 2026 | Comment window (Round 1) | Submit comments via TATT's Consultation Comment Submission Form or consultation@tatt.org.tt; flag any technical, licensing, or fee concerns |
After October 19, 2026 | TATT reviews Round 1 comments | Monitor TATT announcements for the Decisions on Recommendations (DoRs) matrix and Round 2 draft |
Round 2 (date TBC, minimum 4 weeks) | Second consultation round | Review revised draft; confirm earlier comments were addressed; submit follow-up comments if needed |
Post-Round 2 | Framework finalized (Version 1.0) | Align product certification, licensing applications, and concession filings with the final rules |
Ongoing (post-finalization) | Framework review cycle | Note the framework will be reviewed at least every four years track future consultations for further changes |

