top of page

Paraguay CONATEL Telecommunications Plan 2026-2030: IoT

14 hours ago
3 min read

Paraguay CONATEL Telecommunications Plan 2026-2030: Draft Opens Consultation on IoT Homologation


The Paraguay CONATEL telecommunications plan 2026-2030 has reached the public consultation stage. Paraguay's Comisión Nacional de Telecomunicaciones (CONATEL) has published the draft Plan Nacional de Telecomunicaciones (PNT) 2026–2030 and has since extended the consultation period. For equipment manufacturers, the most relevant part is section 3.8, which commits CONATEL to define registration and homologation requirements for IoT devices.


Background: CONATEL's national telecommunications planning


CONATEL sets its regulatory priorities through multi-year national telecommunications plans; the previous plan covered 2021–2025. The new draft reviews the state of the market, including limited commercial 5G deployment, and sets objectives for the next five years. It sits alongside other CONATEL work affecting equipment, including the review of homologation rules that GMA Labs reported in August 2026.


Key Changes in the Paraguay CONATEL Telecommunications Plan 2026-2030


The draft is a policy plan, so it does not change requirements immediately. It does set out what CONATEL intends to regulate.


IoT connectivity and homologation (section 3.8)


  • CONATEL identifies low-power wide-area (LPWA) technologies as key for sensors, smart meters and industrial devices, with NB-IoT and LTE-M in licensed bands and LoRaWAN in the ISM band.

  • It plans to update the spectrum framework to support these technologies.

  • It states that registration and homologation requirements for IoT devices need to be defined.

  • It calls for conditions on the interoperability and security of sensor networks.


Spectrum management


  • The draft proposes to assess and progressively adopt dynamic spectrum allocation, interference databases and shared spectrum use (section 3.8).

  • Strengthening spectrum management is a strategic objective (OE1.2).

  • The 700 MHz band is being freed for 4G (IMT) as analogue TV switches off, with shutdowns scheduled for 31 December 2026 and 30 September 2027 for different groups (section 2.2.6).


5G and private networks


  • The plan sets a 2030 market outcome of at least 30% of the population covered by 5G (section 1.1).

  • It notes the need for updated quality-of-service rules for 5G and easier small-cell deployment, and flags possible authorisation mechanisms for private 5G networks in agriculture, mining and logistics (section 3.8).


Digital TV receivers


CONATEL's Digital TV Laboratory tests receivers for compatibility with the national standard (section 2.2.6).


Infographic detailing Paraguay's CONATEL Telecommunications Plan 2026–2030, highlighting IoT homologation requirements, LPWA technologies, spectrum management, a 2026–2030 timeline, and key compliance actions for manufacturers.

What This Means for Manufacturers


  • IoT device makers using NB-IoT, LTE-M or LoRaWAN should expect new registration and homologation requirements for Paraguay during the plan period.

  • Security conditions for sensor networks may become part of the approval criteria, so security documentation is worth preparing early.

  • Spectrum framework updates could change the conditions for LPWA and ISM-band devices; current certificates are not affected by the draft itself.

  • Makers of 4G equipment should follow the 700 MHz refarming linked to the analogue TV switch-off.

  • Private 5G equipment suppliers should watch for new authorisation mechanisms.

  • The consultation is the chance to influence these rules before they are written.


Certification Impact Summary


Area

Before

After / New requirement

Impact level

Products in scope

Current CONATEL homologation scope

IoT devices flagged for defined registration and homologation requirements (planned)

Medium

Technical requirements

Current spectrum framework

Updated framework for NB-IoT, LTE-M and LoRaWAN (planned)

Medium

Security

No sensor-network security conditions in the plan

Interoperability and security conditions for sensor networks (planned)

Medium

Existing certificates

Valid

Unchanged by the draft plan

Low

New applications

Current procedure

Unchanged until implementing rules are adopted

Low

Spectrum

Static allocation

Dynamic and shared spectrum to be assessed progressively

Low


Timeline and Required Actions


Key Dates


Date

Milestone

October 2026

Draft PNT 2026–2030 published for public consultation

To be confirmed

Extended consultation deadline

31 December 2026

Analogue TV shutdown for Group 5 (700 MHz refarming)

30 September 2027

Analogue TV shutdown for Groups 7 and 9

2026–2030

Plan period; implementing rules for IoT homologation to be developed


Required Actions for Manufacturers


  1. Read section 3.8 of the draft and identify which of your IoT products fall under LPWA technologies.

  2. Check with CONATEL whether the consultation is still open and how to submit comments.

  3. Prepare comments on IoT registration, homologation and security conditions if your products are affected.

  4. Review your current Paraguay certificates and product roadmap against the planned changes.

  5. Document the security features of sensor and gateway products.

  6. Monitor CONATEL for the final plan and the implementing homologation rules.


Conclusion


The draft Paraguay CONATEL telecommunications plan 2026-2030 signals that IoT devices will get their own registration and homologation requirements. The rules aren't written yet, so this is the moment for manufacturers to engage. Contact our team for support with Paraguay homologation and market access planning.

bottom of page