India TEC 2.4 GHz 5 GHz Consultation
- 3 days ago
- 2 min read
India TEC 2.4 GHz 5 GHz Consultation: What Is Being Reviewed?
The India TEC 2.4 GHz 5 GHz consultation represents an important step toward updating wireless regulations in the country. Through this initiative, the Telecommunication Engineering Centre (TEC) is seeking industry feedback on how these widely used spectrum bands should be managed, particularly for Wi-Fi, IoT devices, and fixed wireless phones.
This consultation focuses on two key areas:
Use of 2.4 GHz and 5 GHz frequency bands
Regulatory framework for Fixed Wireless Phones (FWP)
The initiative reflects India’s broader effort to modernize telecom regulations and align with international standards.
Key Areas Covered in the Consultation
1. 2.4 GHz and 5 GHz Bands
These frequency bands are widely used for:
Wi-Fi devices
IoT applications
Short-range wireless communications
The consultation reviews:
Power limits (EIRP)
Channel allocation and usage
Interference mitigation
License-exempt operation conditions
2. Fixed Wireless Phones (FWP)
Fixed Wireless Phones are devices that:
Operate over cellular networks
Provide fixed-location voice services
The consultation evaluates:
Technical specifications
Network compatibility
Compliance and approval processes

What’s Changing Compared to Existing Regulations?
Previous Framework
Limited clarity on unlicensed band usage
Outdated technical requirements
Inconsistent certification pathways
Proposed Updates
Revised power and operational limits
Improved alignment with global standards
Clearer certification and compliance procedures
Structured framework for FWP approval
What This Means for Manufacturers
Manufacturers and stakeholders should anticipate:
Wi-Fi / IoT Device Manufacturers
Potential updates to RF parameters
Need to review spectrum usage compliance
FWP Device Suppliers
More defined approval processes
Possible tightening of technical requirements
Global Market Players
Easier regulatory alignment in the long term
Reduced complexity for multi-market compliance
Early engagement in the consultation process is strongly recommended.
Certification Impact Summary
Area | Expected Impact |
RF Testing | Updates to power limits and test conditions |
Documentation | Revised technical documentation required |
Type Approval | More structured and possibly stricter process |
Compliance Strategy | Need for early regulatory alignment |
Timeline + Required Actions
Expected Timeline
Consultation Open: Q1 2026
Comment Period: ~30–45 days
Final Regulation: Expected later in 2026 (June)
Recommended Actions
Review the consultation document on the official TEC website
Submit stakeholder comments (if applicable)
Conduct internal gap analysis for:
RF parameters
Existing certifications
Monitor updates from TEC and DoT
The India TEC 2.4 GHz 5 GHz consultation signals a move toward a more transparent, harmonized, and future-ready regulatory framework. While still in the consultation phase, it is a critical step that manufacturers should monitor closely to ensure continued compliance and market access in India.
